Concrete footings in Edwardsville IL - a deck that rests on solid ground
Building a deck, or looking at posts that have sunk or leaned? We set concrete footings deep enough, on solid ground, so the structure stays put.

What goes into setting concrete footings in Edwardsville?
Concrete footings are the concrete bases set below ground that carry a deck or other structure. In Edwardsville, we pour them on undisturbed soil, ground nobody has dug before, so the weight rests on something solid.
Most footing calls start with a deck plan, or with old posts that have sunk or tipped. The price moves with how many footings you need, how deep each one goes and how hard the digging is. The schedule depends on the permit, the utility marks, the inspection and the weather on pour day. After I measure, my estimate tells you what we'll pour and how.
Footings go as deep as your local office calls for and keep away from utility lines, so we check both before the first hole is dug, and we handle the permit paperwork our work needs. If a patio or walk sits where a footing belongs, concrete cutting opens a clean hole through it without tearing out the whole slab.
What to know before concrete footings go in
Nobody looks at a footing again once the deck is built, which is exactly why it's worth getting right. A few things decide where your footings go and how we build them.
Close to the house wall
A national deck guide says a footing closer than 5 feet to your foundation wall has to sit as deep as the house's own footing. With a basement, the guide recommends a caisson, a round footing, so there's less digging against the wall.
What's buried in the yard
Footings belong away from septic systems, leach fields, utility lines and enclosed meters. A call to 811 gets the local utilities involved before digging, so we can lay the holes out around whatever's down there.
Which footing style fits
One style uses a concrete stem to cut down on concrete. Another sets the post right in the concrete over a gravel base so water drains away, but the guide says a post set that way has to be specially designed if it must resist sideways loads.
Stairs need the same depth
Stair posts need footings as deep as the deck's. Under the guide, the stringers, the side boards that carry the steps, rest on a patio or pad only when it's founded that deep.
Footing questions we hear most
How deep do concrete footings need to be in Edwardsville?
The deck guide says footings sit at least 12 inches below undisturbed ground or below the frost line, whichever is deeper. The frost line comes from your local building office, so that office's figure decides how deep each hole goes. We get it from the city or the county before anyone picks up a shovel.
How much do concrete footings cost?
Installed concrete footings across the US usually cost about $250 to $3,500 per job. That's a wide spread because two footings for a small landing and a full deck next to a basement wall are very different jobs. The number of footings, their depth, the digging and any caissons move the price most, and my estimate spells out what we'll pour and how.
Do I need a permit for concrete footings in Edwardsville or Madison County?
Edwardsville generally requires a building permit to build or remodel, but its list names work like additions and moved walls, not footings, so ask Public Works about your project. The packets are on Edwardsville's building permit page. Outside city limits in unincorporated Madison County, the county's Building & Zoning Department needs a permit and plans before work starts and sends an inspector at set points. We work in the cities around Edwardsville on both sides of the river, in Illinois and Missouri, and we check with the office for each address.
What if my house is in the Edwardsville historic district?
Homes in Edwardsville's City Historic District, and landmark properties, need approval for any exterior work. Call the city at 618-692-7535 to find out whether the Historic Preservation Commission has to review your project. Mention it when you reach out to us so we can plan around it.
How long does it take to put in concrete footings?
Digging and pouring are the quick part, and most of the wait goes to the permit, the utility marks and the soil check. Under the deck guide, the building official checks the soil on site before concrete goes in, and if they expect weak soil, a soils investigation comes first to set how much weight the ground can carry. We work those visits into the schedule and let the concrete cure before anything gets built on top.
What causes deck footings to sink or heave?
It's usually footings sitting on loose, dug-up dirt instead of undisturbed ground, or footings that stop short of where the frost reaches, so the ground moves them. Water running toward the posts makes it worse. If it's the house that has settled and not the deck, that's a job for foundation raising.
Why Edwardsville homeowners call us for footings
I care most about the parts of a job nobody sees, and a footing is all of that. I'd rather tell you a pour should wait than rush it and leave you living with it.
Your estimate, from the owner
I come out, measure and write your estimate myself, in plain words you won't need a dictionary for.
The owner at every pour
I'm on site with our crew when we pour, so the person who planned the footings watches them go in.
Licensed and insured
We're licensed and insured for the work we do on your property.
In business since 2023
We've been at it for three years, and we're known for careful flatwork and the prep underneath it.
Satisfaction guaranteed
Satisfaction guaranteed on every job, and the first step is a call to (618) 800-9951 or the form.
Plan your footings before the lumber arrives
Footings go in first and almost never come out, so call now and we'll set them where your deck needs them.
What happens when you call about footings in Edwardsville?
We plan footings around your house, your yard and your local office, so the holes land where the structure needs them and the inspection doesn't hold up the pour.
Call or send the form
You call (618) 800-9951 or send the form with your address and project, and we get back to you to set up a visit.
I come out and measure
I measure, look at where water runs and check what's near the spot, like the house wall, meters or a septic field.
Estimate and paperwork
My written estimate says what we'll pour and how. Once you say yes, we check the permit side with your local office and get utilities marked.
Dig, inspect and pour
We dig and book the inspection, which Edwardsville can do the same day if it's called in before 9:30 a.m. on a weekday. Then we pour, let it cure and walk the job with you.